Portfolio
US Department of Veterans Affairs - Loma Linda Eye Clinic
A 14,000-SF LEED Platinum eye clinic at Loma Linda VA, featuring 20 exam rooms, laser, procedure, ultrasound, and teaching wet lab spaces. Designed for daylight, user-focused flow, comfort controls, and sustainable performance—advancing veterans’ ocular care.
CHI Clinics
CHI Clinics prototype and site adapt.
CHI Health Creighton University Medical Center at Bergan
CHI Health Creighton University Medical Center at Bergen is an expansion, renovation and relocation of facilities. It is a Trauma 1 Medical Center.
Greenville-Spartanburg International Airport (GSP) Aircraft and Fire Fighting Facility (ARFF)
Greenville-Spartanburg International Airport ARFF. New 24,000 SF ARFF.
Phelps Memorial Hospital Clinical Addition and Renovations
Phelps Memorial Health Center is a critical access hospital located in Holdrege, Nebraska. LEO A DALY provided full engineering services, along with architectural and commissioning services for multiple renovations to the existing hospital and medical office buildings. The project includes the renovation of approximately 13,500 SF for future clinic growth and additional services.
OrthoNebraska Clinic
Working with OrthoNebraska, we developed a prototype model for expansion of their clinic and physical therapy programs, as well as ambulatory surgery expansions to specific locations
Nebraska Medicine Primary Care Clinics
Nebraska Primary Care Clinic designed as a site adapt prototype for Nebraska Medicine’s current method of providing community healthcare services.
Creighton University, Skutt Center Renovation
Skutt Center Renovation at Creighton University.
Cathedral of Our Lady of the Angels
LEO A DALY as Executive Architect and Architect of Record worked with Design Architect, Rafael Moneo, to deliver the iconic Cathedral of Our Lady of the Angels project.
Rocky Mountain Aviation Hangar
Rocky Mountain Aviation Hangar
UNMC CORE Lab Building
Bringing together UNMC’s UNeMed and UNeTech branches with biotech and technology research startups, this five acre site will be home to University’s new 180,000 SF Campus Operations and Research Excellence (CORE) Building.
First Baptist Church, Indian Rocks
First Baptist Church Indian Rocks is a 86,931-SF facility including worship and support areas.
Public Safety Simulation Complex at Wake Tech Community College
Wake Tech Community College's 76,405-SF public safety simulation and drone training facility in Wendell, NC combines indoor first responder training and aerial robotics education.
First Baptist Church, Orlando
First Baptist Church in Orlando is a 106,000-square-foot facility with worship and support spaces.
City of Henderson Fire Station No. 81
Fire Station No. 81 in Henderson is a 27,756‑SF adaptive reuse project converting a former Camping World retail center into a modern, 24/7 facility. The station houses three double‑deep drive‑through bays, living quarters for eleven firefighters and a battalion chief, plus a 10,000‑SF fire warehouse for equipment and medical supply distribution.
Hotel del Coronado
The master plan for the Hotel del Coronado, part of the Curio Collection by Hilton, is a complete re-imagining of this legendary resort, anticipated for completion in late 2021. LEO A DALY's scope of services involves the new construction of an event center along with 142 guestrooms and suites and below-grade parking.
Crowne Plaza Guam and Saipan
Working with Wave Hospitality, multiple properties were renovated to provide a luxury guest experience.
Church by the Glades
Church by the Glades provides an 800-seat sanctuary as well as educational and administrative support areas.
North Metro Regional Public Safety Training Facility
North Metro Range is a regional public safety training facility in Maple Grove, Minnesota. The state-of-the-art, 57,000-SF facility offers firearms training, classrooms, decision-making simulation lab and space for de-escalation training.
Xcel Energy Analytical Testing Labs
Xcel Energy's Minneapolis campus features advanced analytical labs, a fleet maintenance garage, and sustainable design supporting carbon-free goals by 2050. Designed by LEO A DALY, this 313,000-SF facility enhances lab workflows and safety.