Portfolio
LEO A DALY designed the 117,000 SF Minnesota State Patrol Headquarters in Roseville, Minnesota, creating a modern public safety facility that enhances collaboration, security, and emergency response.
The 720,000-square-foot, 36-acre campus was delivered by a design build team led by Whiting-Turner and AECOM with LEO A DALY as a design consultant. The campus includes Offices and workstation suites; 500-seat auditorium; National Intelligence University; Conferencing centers; Dining and cafe; fitness and data centers.
Working with OrthoNebraska, we developed a prototype model for expansion of their clinic and physical therapy programs, as well as ambulatory surgery expansions to specific locations
Working with OrthoNebraska, we developed a prototype model for expansion of their clinic and physical therapy programs, as well as ambulatory surgery expansions to specific locations
Working with OrthoNebraska, we developed a prototype model for expansion of their clinic and physical therapy programs, as well as ambulatory surgery expansions to specific locations
Working with OrthoNebraska, we provided full service architecture, engineering and interior design to add operating rooms at their flagship hospital campus.
Rogers Civic Campus by LEO A DALY creates a downtown civic anchor in Rogers, Minnesota, uniting City Hall and police services with public gathering spaces, shared amenities and modern municipal design.
The 275,000 SF Omaha Public Safety Headquarters will consolidate police and fire departments.
Hubbs Hall at University of California San Diego involved the renovation of interior shell space on the second floor to provide lab planning, architectural and interior design services.
The firm met with identified end-users of the Marine Biology Laboratory space to determine program needs. Set up as a shared lab space between three research teams, the space was designed with adaptability in mind to meet the needs of future end-users
Delawie, in a joint venture with national design firm Perkins & Will successfully completed a new three-story, 89,000 SF University of San Diego Knauss Center for Business Education and the renovation of the 47,000 SF Olin Hall.
Our work with Eldorado Country Club began with a small architectural project and grew to include multiple projects over the years.
The Boca Grove Swim & Fitness Center was designed to provide a modern facility for members and to attract new members to center.
The Titleist Performance Center offers golf enthusiasts an unparalleled club fitting experience.
The reinvention of Mission Hills Country Club was inspired by the majestic Southern California desert landscape—borrowing the natural colors, textures and hues that evolve with each sunrise and sunset over the Santa Rosa Mountains of Coachella Valley.
LEO A DALY provided master planning, architectural, and engineering services for a 132-foot air traffic control tower and 8,000‑SF TRACON facility strategically sited to maximize airfield visibility. The project included extensive site infrastructure improvements, with over 4,500 lineal feet of new utilities, roadway access, and upgrades to airport security and gate systems. All site and facility design was coordinated with the airport’s long-term expansion plans to support future general aviation growth.
The Tulsa Air Traffic Control Tower and TRACON facility replaces an outdated 1961 structure with a modern, code-compliant solution designed to support long-term airport growth. This $76 million project includes a 255-foot tower and a 16,000‑SF TRACON facility, using BIM and energy-efficient systems to create a high-performance workplace for FAA operations. The new intermediate-activity tower and support buildings enhance safety, functionality, and adaptability for the next 50 years.
The Sarasota Bradenton International Airport Air Traffic Control Tower replaces the existing facility with a 109-foot, 10-sided tower and a 9,000‑SF administrative base building designed to FAA standards. The project incorporates a 525‑SF control cab with a butt-glazed window system and minimal structural columns to maximize visibility, along with a durable precast concrete envelope engineered for wind and storm resilience. A comprehensive life-cycle cost analysis informed the selection of high-performance structural and mechanical systems to optimize long-term efficiency, durability, and operational reliability.
The Sacramento International Airport Air Traffic Control Tower replaces the existing facility with a 155-foot, 12-sided tower and a 9,700‑SF administrative base building tailored to FAA standards. The design features a 550‑SF control cab with a butt-glazed window system and minimal columns for maximum visibility, along with high-performance building envelopes to improve energy efficiency. Sustainable strategies, including a photovoltaic field, geothermal HVAC, and daylighting, combined with life-cycle cost analysis, support long-term performance and reduced operational costs.
The Fort Bliss Air Traffic Control Tower provides a 97-foot, 10-story facility with a 3,600‑SF base building designed to support critical Army aviation operations. The tower enables mission control for helicopter and fixed-wing aircraft supporting the 1st Armored Division and associated aviation units, enhancing operational readiness and coordination. The project also includes a communications transmitter building and three remote antenna systems, creating a fully integrated air traffic control and communications network.
The Palm Springs International Airport Air Traffic Control Tower delivers a high-performance, LEED®-informed design tailored to desert conditions, incorporating advanced shading strategies and a distinctive architectural identity. A comprehensive energy study evaluated four HVAC systems alongside a 10,000‑SF photovoltaic array that generates approximately 310,000 kWh annually, reducing operating costs and supporting long-term efficiency. This $21 million, 127-foot tower and 7,000‑SF base building integrates full-service engineering and design to meet FAA requirements and optimize lifecycle performance.
LEO A DALY partnered with the University of Nebraska–Lincoln (UNL) College of Engineering to transform approximately 7,000 SF of former mechanical and air handling space within the basement of the Scott Engineering Center into an innovative robotics and drone research space.
Europa Village by Delawie, a LEO A DALY studio, in Temecula, CA, features three distinct encounters for guests.
The 450,000-square-foot new critical care tower on the VA’s West LA campus will provide comprehensive care for the nation’s veterans in southern California.
The Columbia Heights City Hall is a first-of-its-kind housing and city administration facility.
The Pennington County Administration Building provides expanded facilities for a growing population.
A renovated building serves as the new home for Big Brothers Big Sisters of the Midlands.
A renovated building serves as Triage Staffing’s new corporate workplace with employee experience core to the design.
The new 38,000 SF New Ulm Readiness Center is home to the battalion headquarters for the 1st Battalion, 125th Field Artillery Regiment and Company F of the 134th Support Battalion (ABCT).
Second Harvest Heartland, New Distribution, Warehouse & Volunteer Center
LEO A DALY transformed a 220,000 SF Brooklyn Park facility for Second Harvest Heartland, enhancing food distribution capacity to 150 million pounds annually. The design includes a 25,000 SF volunteer center, cold storage, and community spaces, supporting SHH's mission to end hunger through partnerships.
Publix Distribution Center
Publix Distribution Center #9, 944,712 SF distribution center in Orlando, Florida.
Dollar General Bessemer Distribution Center
Dollar General’s 975,000-SF distribution center is a five-building complex on 106 acres in Bessemer, Alabama, is the company’s tenth distribution center.
Cheney Brothers
The 375,000-SF Cheney Brothers distribution center in Punta Gorda. Florida, integrates resilient construction and efficient mechanical design in an innovative building shape for the broadline food distributor.
Claas Product Development, Warehouse and Training Facility
A 38,440-SF expansion to the Claas Omaha facility adds state‑of‑the‑art training and product development spaces: tech-enabled classrooms, mechatronics labs, temperature‑controlled equipment bays with partitions, maker-spaces and cranes — supporting hands-on learning and innovation.
Thermo King - Product Development, Testing, Training and Display Facility
The design for Thermo King’s Product Development center in Bloomington, MN includes a 594,578-SF world‑class innovation campus: X90 R&D lab, E90 electrification lab, cleanrooms, distribution warehouse, training and engagement spaces, plus office modernization.
Kroger Cincinnati Fresh Distribution Center
A 390,000-SF transformation in Blue Ash, OH, repurposed a 1960s warehouse to house modern dry and perishable storage, freezer space, offices, dock, truck maintenance and employee amenities — all designed to boost operational efficiency and enhance brand identity.
Pella Windows and Doors - Product Development, Warehouse and Distribution Facility
A 50,000 SF two-story facility in Omaha for Pella Windows & Doors includes a 46,000 SF warehouse, 8,450 SF of office space, showroom and reception, separate contractor entrance, 11 dock doors, paint booths, and flexible layout with future growth shell space—enhancing logistics, safety, and client service.
Dollar General, San Antonio Distribution & Maintenance Center
The 932,900-SF Dollar General distribution and maintenance center in San Antonio features a climate-controlled warehouse with 161 loading docks, dispatch office, guardhouses, truck maintenance and energy‑efficient chilled water HVAC—25% below ASHRAE 90.1 2007.
Elliott Equipment, Manufacturing, Maintenance, Training and Product Display Facility
A comprehensive renovation of Elliott Equipment’s 16‑acre Omaha campus: new 145,000-SF manufacturing, 28,000 SF-client and office engagement space, 38,600-SF warehouse, and hands‑on product display labs. Daylit, tech‑enabled environments streamline development, testing, and customer collaboration.
Sysco FreshPoint, Florida Produce Processing & Distribution Center
Sysco FreshPoint Distribution Center in Orlando, Florida. 55,520 SF cooler consisting of multiple temperature zones, banana rooms, cold dock and dock offices.