LEO A DALY structural engineer featured in Modern Steel Construction

Engineer coauthors article about Saint Francis Hospital

A LEO A DALY associate coauthored an article for the November 2024 issue of Modern Steel Construction.

The article offers a case study of the  Saint Francis Hospital renovation and new bed tower in Muskogee, Oklahoma. It details the considerations into choosing a steel structural system as well as special design features of the project.

From the article:

All told, the project succeeded because it set and met an aggressive fast-track design and construction schedule covering everything from construction to design to submittal requirements. The schedule, which included early owner and construction manager input, was feasible largely because of the steel erection’s speed and flexibility. The project is set for completion in the winter of 2025 and will serve its patients, staff, and community for many years.

Read “Up to the Task” on the magazine’s website.

 

Recent Articles


Previous
Previous

LEO A DALY Chairman Receives Lifetime Achievement Award

Next
Next

Rauzia Ally moderates forum with D.C. mayor on revitalizing the district